You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Flooded potholes on shared cycle/footpaths

Reported via mobile in the Pothole category anonymously at 14:52, Monday 14 February 2022

Sent to Rutland County Council less than a minute later

You have been doing some excellent work on the footpaths in my area recently.. There are places on separate footpaths which cause a potential danger and seem to be continually overlooked. The first is on the footpath about 400 mtrs towards Ashwell from the Enterprise Park.. The footpath dips at a field entrance and has no drainage. The footpath consequently spends much of the Winter in a flooded muddy state, forcing pedestrians and cyclists alike to walk on the road to avoid it. Clearly not the intended use of a footpath. The second is on the shared footpath/cycle track at the top of Burley Hill near to the speed limit signs. Last year a contractor dug a series of holes in the footpath.. Soon after completion the holes started to subside. The worst of which is now a deep muddy and flooded hole perhaps 4 to 5 inches deep. It is clearly a severe hazard to any cyclist that might go through it.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report. We will investigate this and respond to you within 10 working days. Updates will be posted on https://rutland.fixmystreet.com/ IMPORTANT: To report anything dangerous, please call us on: 01572 722577

    Posted by Rutland County Council at 02:24, Friday 25 February 2022

  • We have assessed your report and the repair of this defect has been added to our programme of works.¬†IMPORTANT: To report anything dangerous, please call us on: 01572 722577

    State changed to: Closed

    Posted by Rutland County Council at 09:04, Monday

This report is now closed to updates. You can make a new report in the same location.